Tuen Mun Road (TMR) was designed and built in the 1970s.  It is a major road link between Tuen Mun and Kowloon.  As most at-grade sections of TMR have already reached the end of their service life and are now in a state beyond economical repair, the reconstruction and improvement of TMR have commenced in October 2008 for completion in phases in 2014.  After completion the road will be upgraded to the current expressway standards as far as practicable. Moreover, inconvenience to road users due to frequent maintenance works will be reduced.
 
The scope of the project mainly comprises:

Reconstruction of about 13.4km at-grade sections of Tuen Mun Road and resurfacing of about 2.1km of Tuen Mun Road on highway structures between Tsuen Wan and Sam Shing Hui;
Improvement of the road design of Tuen Mun Road according to the current expressway standards as far as practicable, including the widening of traffic lanes, provision of hard shoulders 3.65m wide and improvement of sight lines, gradients, road curvature and super elevation;
Modification of highway structures including viaducts, bridges, box culverts, underpasses, footbridges, subways and re-provisioning of a footbridge;
Upgrading works to roadside slopes and the traffic control and surveillance system (TCSS);
Construction of noise barriers and noise semi-enclosures, landscape works and works on environmental mitigation, drainage, road lightings, water mains and traffic aids.
2012.04
Progress photos of April for Sam Shing Hui Section uploaded
   
2012.04
Progress photos of April for Tai Lam Section uploaded
   
2012.04
Progress photos of April for Eastern Section uploaded
   
 
 
Contract No. HY/2007/09 – Reconstruction and Improvement of Tuen Mun Road – Eastern Section
   
Contract No. HY/2007/10 - Reconstruction and Improvement of Tuen Mun Road – Tai Lam Section
   
Contract No. HY/2008/11 - Reconstruction and Improvement of Tuen Mun Road – Sam Shing Hui Section